In response to a request from the people of Flor Blanca & Palibatz, in the northern part of the municipality of Joyabaj, in the department of Quiché Guatemala eSin Fronteras designed and with the help of our partners in Guatemala constructed this 75-foot long cast-in-place concrete bridge over a river.Construction was completed in February 2026.
e-SF designed this $195,000 project which will install an electric pump in the new well, construct a new 80 cubic meter concrete distribution tank with a chlorination system, a 1,000-meter-long conduction line from the pump to the distribution tank, and a gravity distribution system. The 2,500-meter-long distribution system will include two sectors, break pressure tanks, and 251 taps with water meters installed at each home, the healthcare facility, school, and community center.Project is currently under construction and is projected to be complete by December 2026;